Permit Sets vs Construction Sets: Key Differences Explained

Permit Set vs Construction Set: Key Differences Explained

Introduction

In the architectural and construction workflow, the drawing sets serves different purposes at various stages of a project. Two commonly used terms—Permit Set and Construction Set—are often confused but serve distinctly different roles.
Understanding their differences is essential for the compliance, coordination and successful project execution. This infographic highlights the key contrasts between these two drawing sets to help the developers, architects, engineers and contractors navigate the project development cycle with clarity.

Permit Sets vs Construction Sets: Key Differences Explained

Conclusion

While both the Permit Sets and the Construction Sets are vital components of the architectural documentation, they both serves the distinct purposes at the different project phases. The Permit Set ensures that the design aligns well with the regulatory requirements thereby enabling the quicker project approvals. The Construction Set on the other hand provides a comprehensive guidance for the accurate on-site execution.

Understanding the role of each in the above comparison helps the teams to streamline the approvals, enhance the accuracy in the execution and also maintain the legal compliance.

These drawing sets forms the core deliverables within the Construction Documentation Services ensuring that every stage right from the regulatory approval to the on-site construction is handled with clarity, precision and compliance. 