{"id":1572,"date":"2026-11-06T05:41:24","date_gmt":"2026-11-06T05:41:24","guid":{"rendered":"https:\/\/www.qebimservices.co.uk\/blog\/?p=1572"},"modified":"2026-11-06T06:01:58","modified_gmt":"2026-11-06T06:01:58","slug":"why-outdated-as-built-drawings-can-derail-renovation-projects","status":"publish","type":"post","link":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/","title":{"rendered":"Why Outdated As-Built Drawings Can Derail Renovation Projects?"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Understanding the Risks: As-built drawings should provide a clear and accurate picture of what actually exists on site. Yet many renovation, retrofit, refurbishment and maintenance projects rely on the drawings created years or decades earlier. A document may be labelled \u201cas-built,\u201d but that does not guarantee that it represents the building\u2019s current condition.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Buildings evolve. Partitions move, equipment is replaced, structural modifications are introduced, and MEP services are rerouted. If those changes are not documented, the drawing gradually becomes a record of the past rather than a dependable representation of the present.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The hidden danger is that the project teams may make confident decisions based on the information that appears authoritative but has never been verified.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Why As-Built Drawings Become Outdated?<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">An as-built drawing can become outdated when the construction differs from approved design because of site adjustments or field changes that never reach the final documentation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Buildings also undergo continuous change. Renovations, tenant fit-outs, repairs, equipment upgrades and service modifications accumulate over the years. A wall can move, a ceiling can be lowered, or an HVAC route can change without the original drawing set being revised.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Older documentation may also contain the assumptions rather than just the verified measurements. Small deviations in wall locations, openings, structural elements or ceiling heights can become significant when new work must fit an existing space.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Teams may also have multiple drawing versions, incomplete revision histories or obsolete file formats, making it difficult to identify the latest condition.<\/span><\/p>\n<ol>\n<li><span style=\"text-decoration: underline;\"><b> Design Decisions Start with Wrong Geometry<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">When architects and engineers design from outdated information, errors can enter before construction begins. A proposed partition may align with a wall that has moved, or a new opening may conflict with an existing beam.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These discrepancies are especially problematic in renovation because the existing building is a constraint.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Modern point-cloud workflows can reduce this uncertainty by providing a measured representation of existing conditions. Autodesk identifies point clouds as a reference for existing buildings and BIM authoring in remodeling and retrofit projects.<\/span><\/p>\n<ol start=\"2\">\n<li><span style=\"text-decoration: underline;\"><b> MEP Coordination Becomes More Difficult<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">MEP systems are particularly vulnerable to outdated documentation. Pipes, ducts, cable trays, equipment, and electrical routes are frequently modified during a building\u2019s operational life.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A drawing may show a duct route that was relocated years ago. Designing around that information can create clashes between existing and proposed systems. The issue may remain invisible until ceilings or walls are opened, turning a coordination problem into a site problem.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Accurate existing-condition documentation helps teams coordinate proposed systems against the physical environment before installation and check access, clearance, and routing constraints.<\/span><\/p>\n<ol start=\"3\">\n<li><span style=\"text-decoration: underline;\"><b> Structural Risks Can Stay Hidden<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Older drawings may not reflect later strengthening, alterations, penetrations, removed elements, or changes to load-bearing conditions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A renovation team that assumes a structural wall is exactly where shown may position new openings or services incorrectly. An undocumented beam or column may only be discovered during demolition.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Old drawings remain valuable historical references; the problem is treating them as verified current information.<\/span><\/p>\n<ol start=\"4\">\n<li><span style=\"text-decoration: underline;\"><b> Cost Estimates and Quantities Can Drift<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Dimensions influence quantities, and quantities influence budgets. If floor areas, wall lengths, ceiling heights, openings, or existing service conditions are wrong, takeoffs and estimates can also be wrong.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The financial impact can appear through additional demolition, materials, redesign, fabrication changes, labor, equipment, or contractor variations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Existing-condition BIM can improve quantity extraction and support cost-related analysis.<\/span><\/p>\n<ol start=\"5\">\n<li><span style=\"text-decoration: underline;\"><b> Construction Delays Become More Likely<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">Outdated drawings shift uncertainty from the design office to the construction site. Instead of resolving discrepancies during coordination, teams discover them during installation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That can trigger RFIs, redesigns, procurement changes, rework, and schedule disruption. In complex refurbishment projects, one incorrect assumption can affect several interconnected disciplines.<\/span><\/p>\n<ol start=\"6\">\n<li><span style=\"text-decoration: underline;\"><b> Facility Management Also Suffers<\/b><\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">The problem does not necessarily end at project completion. Facilities teams depend on reliable information to understand spaces, assets, systems, maintenance requirements, and building configuration.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">BIM for facility management also depends on identifying and verifying information for efficient exchange between BIM and FM systems. If underlying information is obsolete, digital records can inherit the same uncertainty.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>How to Reduce the Risks?<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">The first step is to treat existing drawings as reference information, not unquestionable ground truth. Before renovation or retrofit work, teams should compare available documentation with current site conditions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Depending on project complexity, this can involve field verification, surveying, laser scanning, photography, or point-cloud capture. Point-cloud data can then support an updated model. NIST research has examined reconstructing as-built BIMs from laser-scanned point clouds because conventional CAD records do not necessarily capture how a facility was actually built.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The resulting documentation can be developed into coordinated 2D drawings or a BIM model. Teams should know what was measured, when it was captured, how it was modeled, and what accuracy the deliverable represents.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This is where <a href=\"https:\/\/www.qebimservices.co.uk\/as-built-modeling-services.php\"><strong>As Built Modeling Services<\/strong><\/a> can add value by translating verified existing-condition data into structured digital models for architects, engineers, contractors, and facility teams.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Similarly, <a href=\"https:\/\/www.qebimservices.co.uk\/as-built-drawings.php\"><strong>As Built Drawing Services<\/strong><\/a> can create updated plans, elevations, sections, and other documentation from verified conditions rather than legacy files.<\/span><\/p>\n<p><b>\u00a0<\/b><\/p>\n<p><span style=\"text-decoration: underline;\"><b>Conclusion<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400;\">Outdated as-built drawings rarely announce themselves as a problem. They look official and complete. That is what makes them dangerous.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The safest approach is to validate existing documentation against the building that exists today. Verified geometry helps teams identify discrepancies earlier, reduce rework, improve coordination, and make informed decisions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For existing buildings, accurate documentation is a risk-control mechanism that connects what the project team thinks exists with what is physically there.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Understanding the Risks: As-built drawings should provide a clear and accurate picture of what actually exists on site. Yet many renovation, retrofit, refurbishment and maintenance projects rely on the drawings created years or decades earlier. A document may be labelled \u201cas-built,\u201d but that does not guarantee that it represents the building\u2019s current condition. Buildings evolve. &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/\"> <span class=\"screen-reader-text\">Why Outdated As-Built Drawings Can Derail Renovation Projects?<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1573,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","footnotes":""},"categories":[15,88],"tags":[291,89,114],"class_list":["post-1572","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-as-built-bim-services","category-as-built-drawings-services","tag-as-built-drawing-services","tag-as-built-drawings","tag-as-built-services"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Why Outdated As-Built Drawings Can Derail Renovation Projects?<\/title>\n<meta name=\"description\" content=\"Learn how outdated as-built drawings lead to costly errors, project delays, and rework, and why accurate documentation matters in renovations.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Why Outdated As-Built Drawings Can Derail Renovation Projects?\" \/>\n<meta property=\"og:description\" content=\"Learn how outdated as-built drawings lead to costly errors, project delays, and rework, and why accurate documentation matters in renovations.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"QeBIM Service co.uk\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Qe_CAD-110791540439713\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-06T05:41:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-06T06:01:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2026\/11\/Why-Outdated-As-Built-Drawings-Can-Derail-Renovation-Projects.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1140\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Dolly Bulchandani\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@qecad3d\" \/>\n<meta name=\"twitter:site\" content=\"@qecad3d\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dolly Bulchandani\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/\"},\"author\":{\"name\":\"Dolly Bulchandani\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/1cf825b1ce58f54676f1c6c3a4f14d09\"},\"headline\":\"Why Outdated As-Built Drawings Can Derail Renovation Projects?\",\"datePublished\":\"2026-11-06T05:41:24+00:00\",\"dateModified\":\"2026-11-06T06:01:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/\"},\"wordCount\":909,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#organization\"},\"keywords\":[\"As-Built Drawing Services\",\"As-Built Drawings\",\"As-built Services\"],\"articleSection\":[\"As Built BIM Services\",\"As-Built Drawings Services\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/\",\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/\",\"name\":\"Why Outdated As-Built Drawings Can Derail Renovation Projects?\",\"isPartOf\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#website\"},\"datePublished\":\"2026-11-06T05:41:24+00:00\",\"dateModified\":\"2026-11-06T06:01:58+00:00\",\"description\":\"Learn how outdated as-built drawings lead to costly errors, project delays, and rework, and why accurate documentation matters in renovations.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.qebimservices.co.uk\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Why Outdated As-Built Drawings Can Derail Renovation Projects?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#website\",\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/\",\"name\":\"QeBIM Service co.uk\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.qebimservices.co.uk\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#organization\",\"name\":\"QeBIM Service co.uk\",\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2023\/05\/QeBIM_Logo_Final.png\",\"contentUrl\":\"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2023\/05\/QeBIM_Logo_Final.png\",\"width\":500,\"height\":205,\"caption\":\"QeBIM Service co.uk\"},\"image\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Qe_CAD-110791540439713\/\",\"https:\/\/twitter.com\/qecad3d\",\"https:\/\/www.linkedin.com\/company\/qecad\",\"https:\/\/in.pinterest.com\/Qe_CAD\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/1cf825b1ce58f54676f1c6c3a4f14d09\",\"name\":\"Dolly Bulchandani\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/40c3c0273ab6ffddd3b70021a42d54dc5626a8d168d32866701da7d0d2f8d435?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/40c3c0273ab6ffddd3b70021a42d54dc5626a8d168d32866701da7d0d2f8d435?s=96&d=mm&r=g\",\"caption\":\"Dolly Bulchandani\"},\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/author\/dollybulchandani\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Why Outdated As-Built Drawings Can Derail Renovation Projects?","description":"Learn how outdated as-built drawings lead to costly errors, project delays, and rework, and why accurate documentation matters in renovations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/","og_locale":"en_US","og_type":"article","og_title":"Why Outdated As-Built Drawings Can Derail Renovation Projects?","og_description":"Learn how outdated as-built drawings lead to costly errors, project delays, and rework, and why accurate documentation matters in renovations.","og_url":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/","og_site_name":"QeBIM Service co.uk","article_publisher":"https:\/\/www.facebook.com\/Qe_CAD-110791540439713\/","article_published_time":"2026-11-06T05:41:24+00:00","article_modified_time":"2026-11-06T06:01:58+00:00","og_image":[{"width":1140,"height":600,"url":"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2026\/11\/Why-Outdated-As-Built-Drawings-Can-Derail-Renovation-Projects.jpg","type":"image\/jpeg"}],"author":"Dolly Bulchandani","twitter_card":"summary_large_image","twitter_creator":"@qecad3d","twitter_site":"@qecad3d","twitter_misc":{"Written by":"Dolly Bulchandani","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/#article","isPartOf":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/"},"author":{"name":"Dolly Bulchandani","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/1cf825b1ce58f54676f1c6c3a4f14d09"},"headline":"Why Outdated As-Built Drawings Can Derail Renovation Projects?","datePublished":"2026-11-06T05:41:24+00:00","dateModified":"2026-11-06T06:01:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/"},"wordCount":909,"commentCount":0,"publisher":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/#organization"},"keywords":["As-Built Drawing Services","As-Built Drawings","As-built Services"],"articleSection":["As Built BIM Services","As-Built Drawings Services"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/","url":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/","name":"Why Outdated As-Built Drawings Can Derail Renovation Projects?","isPartOf":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/#website"},"datePublished":"2026-11-06T05:41:24+00:00","dateModified":"2026-11-06T06:01:58+00:00","description":"Learn how outdated as-built drawings lead to costly errors, project delays, and rework, and why accurate documentation matters in renovations.","breadcrumb":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.qebimservices.co.uk\/blog\/why-outdated-as-built-drawings-can-derail-renovation-projects\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.qebimservices.co.uk\/blog\/"},{"@type":"ListItem","position":2,"name":"Why Outdated As-Built Drawings Can Derail Renovation Projects?"}]},{"@type":"WebSite","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#website","url":"https:\/\/www.qebimservices.co.uk\/blog\/","name":"QeBIM Service co.uk","description":"","publisher":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.qebimservices.co.uk\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#organization","name":"QeBIM Service co.uk","url":"https:\/\/www.qebimservices.co.uk\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2023\/05\/QeBIM_Logo_Final.png","contentUrl":"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2023\/05\/QeBIM_Logo_Final.png","width":500,"height":205,"caption":"QeBIM Service co.uk"},"image":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Qe_CAD-110791540439713\/","https:\/\/twitter.com\/qecad3d","https:\/\/www.linkedin.com\/company\/qecad","https:\/\/in.pinterest.com\/Qe_CAD\/"]},{"@type":"Person","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/1cf825b1ce58f54676f1c6c3a4f14d09","name":"Dolly Bulchandani","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/40c3c0273ab6ffddd3b70021a42d54dc5626a8d168d32866701da7d0d2f8d435?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40c3c0273ab6ffddd3b70021a42d54dc5626a8d168d32866701da7d0d2f8d435?s=96&d=mm&r=g","caption":"Dolly Bulchandani"},"url":"https:\/\/www.qebimservices.co.uk\/blog\/author\/dollybulchandani\/"}]}},"_links":{"self":[{"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/posts\/1572","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=1572"}],"version-history":[{"count":4,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/posts\/1572\/revisions"}],"predecessor-version":[{"id":1577,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/posts\/1572\/revisions\/1577"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/media\/1573"}],"wp:attachment":[{"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=1572"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=1572"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=1572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}