{"id":1165,"date":"2025-11-13T05:04:27","date_gmt":"2025-11-13T05:04:27","guid":{"rendered":"https:\/\/www.qebimservices.co.uk\/blog\/?p=1165"},"modified":"2026-02-05T10:31:23","modified_gmt":"2026-02-05T10:31:23","slug":"how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows","status":"publish","type":"post","link":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/","title":{"rendered":"How Navisworks Clash Detection Improves Project Collaboration in BIM Workflows?"},"content":{"rendered":"<p><span style=\"font-weight: 400\">In any construction project, collaboration between the architects, engineers and contractors is both essential as well as challenging. No matter how carefully planned a design may seem, coordination issues often arise once multiple disciplines start sharing their models. Imagine discovering that a structural beam cuts through an air duct or that a plumbing line interferes with electrical conduits \u2014 these clashes can easily derail the timelines and inflate the costs.<\/span><\/p>\n<p><span style=\"font-weight: 400\">That\u2019s where <\/span><b>Navisworks Clash Detection<\/b><span style=\"font-weight: 400\"> comes in for a rescue. Acting as a bridge between the different design teams, it identifies these conflicts early in the digital model \u2014 long before they turn into on-site problems. Beyond just finding clashes, Navisworks enables the AEC teams to communicate better, make informed design adjustments and ultimately delivering the projects more efficiently yet collaboratively.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u00a0<\/span><\/p>\n<p><span style=\"text-decoration: underline\"><b>Understanding Clash Detection in Navisworks<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400\">Clash detection in Navisworks involves analyzing the federated 3D models to identify and resolve the design conflicts before even the construction begins. The software combines the architectural, structural and MEP models into a single environment hence allowing the teams to visualize spatial relationships and detect the inconsistencies in geometry or even the design intent.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Navisworks categorizes clashes into three main types:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Hard Clashes:<\/b><\/span><span style=\"font-weight: 400\"> These are classified as the physical intersections between two elements (e.g., a duct intersecting a beam).<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Soft Clashes:<\/b><\/span><span style=\"font-weight: 400\"> These are the clearance or tolerance issues, often related to the maintenances or accessibility requirements.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Workflow Clashes<\/b><b>: <\/b><\/span><span style=\"font-weight: 400\">These are the scheduling or sequencing conflicts that arises during the project phasing.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400\">By identifying these issues early, Navisworks helps the teams to prevent the costly field modifications and delays during the construction.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u00a0<\/span><\/p>\n<p><span style=\"text-decoration: underline\"><b>Enhancing Collaboration Across Disciplines<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400\">Clash detection isn\u2019t just about identifying the problems\u2014it\u2019s about enabling the effective collaboration. Navisworks facilitates the multi-disciplinary communication through a centralized model review platform thereby allowing the architects, engineers and contractors to work from a single source of truth.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Here\u2019s how it enhances project collaboration:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Centralized Data Environment:<\/b><\/span><span style=\"font-weight: 400\"> Navisworks aggregates all the design data into a coordinated model thereby promoting the transparency and accessibility.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Real-Time Issue Tracking:<\/b><\/span><span style=\"font-weight: 400\"> Integrated tools like Clash Detective and Coordination Report lets the teams to log, assign and track the clash resolutions efficiently.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Better Decision-Making<\/b><b>:<\/b><\/span><span style=\"font-weight: 400\"> With 3D visualization and interference reporting, stakeholders can make informed design decisions quite faster.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Reduced Change Orders:<\/b><\/span><span style=\"font-weight: 400\"> Early clash resolution prevents the design errors from propagating into the construction phase.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Improved Client Communication:<\/b><\/span><span style=\"font-weight: 400\"> The model-based visualization helps the non-technical clients to understand the spatial and design implications.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400\">\u00a0<\/span><\/p>\n<p><span style=\"text-decoration: underline\"><b>Integration with BIM Coordination and MEP Models<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400\">When integrated with the <\/span><a href=\"https:\/\/www.qebimservices.co.uk\/bim-coordination-services.php\"><b>BIM Coordination Services<\/b><\/a><span style=\"font-weight: 400\">, Navisworks acts as a unifying platform for all the disciplines hence enabling the smooth exchange and validation of the design information. Particularly in <\/span><a href=\"https:\/\/www.qebimservices.co.uk\/mep-bim-services.php\"><b>MEP BIM Modeling Services<\/b><\/a><span style=\"font-weight: 400\">, where the dense networks of pipes, ducts, and conduits must coexist within the tight spaces, clash detection ensures the constructability without compromising on the performance or safety.<\/span><\/p>\n<p><span style=\"font-weight: 400\">For instance, coordination between the HVAC ducts and structural beams can be optimized during the design stage thereby preventing the expensive reworks on-site. This integrated workflow results in the improved accuracy, schedule adherence and cost predictability.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u00a0<\/span><\/p>\n<p><span style=\"text-decoration: underline\"><b>From Detection to Resolution: The Navisworks Workflow<\/b><\/span><\/p>\n<ol>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Model Aggregation:<\/b><\/span><span style=\"font-weight: 400\"> Import models from various authoring tools such as Revit, AutoCAD or Tekla.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Clash Setup<\/b><b>:<\/b><\/span><span style=\"font-weight: 400\"> Define clash rules, tolerance values and category-based filters to control the detection process.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Run Clash Tests:<\/b><\/span><span style=\"font-weight: 400\"> Execute tests to identify the interferences and generate reports.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Issue Management<\/b><b>:<\/b><\/span><span style=\"font-weight: 400\"> Assign clashes to the responsible teams using tools like BIM 360 or Autodesk Construction Cloud.<\/span><\/li>\n<li style=\"font-weight: 400\"><span style=\"text-decoration: underline\"><b>Resolution and Verification<\/b><b>:<\/b><\/span><span style=\"font-weight: 400\"> Update the design models, rerun the clash tests and verify the resolved issues.<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400\">This iterative workflow ensures that all the design conflicts are addressed before even the construction begins, fostering a proactive rather than reactive project culture.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u00a0<\/span><\/p>\n<p><span style=\"text-decoration: underline\"><b>Conclusion<\/b><\/span><\/p>\n<p><span style=\"font-weight: 400\">Navisworks Clash Detection is more than a coordination tool\u2014it\u2019s a collaboration enabler. By integrating the models, detecting conflicts early and streamlining the communication among the stakeholders, it transforms how the teams plan, design as well as deliver the projects.<\/span><\/p>\n<p><span style=\"font-weight: 400\">Whether you\u2019re managing the architectural coordination or handling intricate MEP layouts, leveraging the clash detection within the BIM workflows helps to deliver the projects faster, with fewer surprises and greater confidence in the design accuracy.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In any construction project, collaboration between the architects, engineers and contractors is both essential as well as challenging. No matter how carefully planned a design may seem, coordination issues often arise once multiple disciplines start sharing their models. Imagine discovering that a structural beam cuts through an air duct or that a plumbing line interferes &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/\"> <span class=\"screen-reader-text\">How Navisworks Clash Detection Improves Project Collaboration in BIM Workflows?<\/span> Read More &raquo;<\/a><\/p>\n","protected":false},"author":2,"featured_media":1230,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":""},"categories":[21,19,80],"tags":[218,138],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Navisworks Clash Detection for Better BIM Collaboration<\/title>\n<meta name=\"description\" content=\"Navisworks clash detection streamlines BIM workflows by catching conflicts early, improving communication, and reducing costly site errors.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Navisworks Clash Detection for Better BIM Collaboration\" \/>\n<meta property=\"og:description\" content=\"Navisworks clash detection streamlines BIM workflows by catching conflicts early, improving communication, and reducing costly site errors.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/\" \/>\n<meta property=\"og:site_name\" content=\"QeBIM Service co.uk\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Qe_CAD-110791540439713\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-13T05:04:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-05T10:31:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2025\/11\/How-Navisworks-Clash-Detection-Improves-Project-Collaboration-in-BIM-Workflows1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1140\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Dolly Bulchandani\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@qecad3d\" \/>\n<meta name=\"twitter:site\" content=\"@qecad3d\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dolly Bulchandani\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/\"},\"author\":{\"name\":\"Dolly Bulchandani\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/1cf825b1ce58f54676f1c6c3a4f14d09\"},\"headline\":\"How Navisworks Clash Detection Improves Project Collaboration in BIM Workflows?\",\"datePublished\":\"2025-11-13T05:04:27+00:00\",\"dateModified\":\"2026-02-05T10:31:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/\"},\"wordCount\":707,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#organization\"},\"keywords\":[\"BIM Clash Detection &amp; Coordination\",\"MEP BIM Services\"],\"articleSection\":[\"BIM Coordination Services\",\"BIM Modeling Services\",\"MEP BIM Services\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/\",\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/\",\"name\":\"Navisworks Clash Detection for Better BIM Collaboration\",\"isPartOf\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#website\"},\"datePublished\":\"2025-11-13T05:04:27+00:00\",\"dateModified\":\"2026-02-05T10:31:23+00:00\",\"description\":\"Navisworks clash detection streamlines BIM workflows by catching conflicts early, improving communication, and reducing costly site errors.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.qebimservices.co.uk\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Navisworks Clash Detection Improves Project Collaboration in BIM Workflows?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#website\",\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/\",\"name\":\"QeBIM Service co.uk\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.qebimservices.co.uk\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#organization\",\"name\":\"QeBIM Service co.uk\",\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2023\/05\/QeBIM_Logo_Final.png\",\"contentUrl\":\"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2023\/05\/QeBIM_Logo_Final.png\",\"width\":500,\"height\":205,\"caption\":\"QeBIM Service co.uk\"},\"image\":{\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Qe_CAD-110791540439713\/\",\"https:\/\/twitter.com\/qecad3d\",\"https:\/\/www.linkedin.com\/company\/qecad\",\"https:\/\/in.pinterest.com\/Qe_CAD\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/1cf825b1ce58f54676f1c6c3a4f14d09\",\"name\":\"Dolly Bulchandani\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g\",\"caption\":\"Dolly Bulchandani\"},\"url\":\"https:\/\/www.qebimservices.co.uk\/blog\/author\/dollybulchandani\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Navisworks Clash Detection for Better BIM Collaboration","description":"Navisworks clash detection streamlines BIM workflows by catching conflicts early, improving communication, and reducing costly site errors.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/","og_locale":"en_US","og_type":"article","og_title":"Navisworks Clash Detection for Better BIM Collaboration","og_description":"Navisworks clash detection streamlines BIM workflows by catching conflicts early, improving communication, and reducing costly site errors.","og_url":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/","og_site_name":"QeBIM Service co.uk","article_publisher":"https:\/\/www.facebook.com\/Qe_CAD-110791540439713\/","article_published_time":"2025-11-13T05:04:27+00:00","article_modified_time":"2026-02-05T10:31:23+00:00","og_image":[{"width":1140,"height":600,"url":"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2025\/11\/How-Navisworks-Clash-Detection-Improves-Project-Collaboration-in-BIM-Workflows1.jpg","type":"image\/jpeg"}],"author":"Dolly Bulchandani","twitter_card":"summary_large_image","twitter_creator":"@qecad3d","twitter_site":"@qecad3d","twitter_misc":{"Written by":"Dolly Bulchandani","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/#article","isPartOf":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/"},"author":{"name":"Dolly Bulchandani","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/1cf825b1ce58f54676f1c6c3a4f14d09"},"headline":"How Navisworks Clash Detection Improves Project Collaboration in BIM Workflows?","datePublished":"2025-11-13T05:04:27+00:00","dateModified":"2026-02-05T10:31:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/"},"wordCount":707,"commentCount":0,"publisher":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/#organization"},"keywords":["BIM Clash Detection &amp; Coordination","MEP BIM Services"],"articleSection":["BIM Coordination Services","BIM Modeling Services","MEP BIM Services"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/","url":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/","name":"Navisworks Clash Detection for Better BIM Collaboration","isPartOf":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/#website"},"datePublished":"2025-11-13T05:04:27+00:00","dateModified":"2026-02-05T10:31:23+00:00","description":"Navisworks clash detection streamlines BIM workflows by catching conflicts early, improving communication, and reducing costly site errors.","breadcrumb":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.qebimservices.co.uk\/blog\/how-navisworks-clash-detection-improves-project-collaboration-in-bim-workflows\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.qebimservices.co.uk\/blog\/"},{"@type":"ListItem","position":2,"name":"How Navisworks Clash Detection Improves Project Collaboration in BIM Workflows?"}]},{"@type":"WebSite","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#website","url":"https:\/\/www.qebimservices.co.uk\/blog\/","name":"QeBIM Service co.uk","description":"","publisher":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.qebimservices.co.uk\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#organization","name":"QeBIM Service co.uk","url":"https:\/\/www.qebimservices.co.uk\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2023\/05\/QeBIM_Logo_Final.png","contentUrl":"https:\/\/www.qebimservices.co.uk\/blog\/wp-content\/uploads\/2023\/05\/QeBIM_Logo_Final.png","width":500,"height":205,"caption":"QeBIM Service co.uk"},"image":{"@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Qe_CAD-110791540439713\/","https:\/\/twitter.com\/qecad3d","https:\/\/www.linkedin.com\/company\/qecad","https:\/\/in.pinterest.com\/Qe_CAD\/"]},{"@type":"Person","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/1cf825b1ce58f54676f1c6c3a4f14d09","name":"Dolly Bulchandani","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.qebimservices.co.uk\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e8c5399c9fc7248fb0235ede2c75129f?s=96&d=mm&r=g","caption":"Dolly Bulchandani"},"url":"https:\/\/www.qebimservices.co.uk\/blog\/author\/dollybulchandani\/"}]}},"_links":{"self":[{"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/posts\/1165"}],"collection":[{"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=1165"}],"version-history":[{"count":5,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/posts\/1165\/revisions"}],"predecessor-version":[{"id":1232,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/posts\/1165\/revisions\/1232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/media\/1230"}],"wp:attachment":[{"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=1165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=1165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.qebimservices.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=1165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}